Sub-contracting Notices 2014
2013-01-05 Install 4 new Exterior Doors
2013-01-05 Install new doors on Pump House
2013-01-22 Standing List of SubContractors not requiring notice
2013-02-06 Replace 808 PERC with SS Welded Pipe
2013-02-21 Install window in Closet by L Reams office
2013-03-04 Cumberland Machine - Install new 832 equipment
2013-03-13 Weld up new secton of steam tube for 830
2013-03-18 Gem Gravier to commission 2 Gem Printers
2013-03-18 Installation of piping on the new 832 line
2013-03-19 Install new CV Office Door
2013-03-28 Install new telephone wiring cabinet on top of CV office
2013-04-22 Remove floor coating at 865 - test area first
2012-11-29 Pressure wash N and W walls
2013-04-26 Power Sweep outside Lots
2013-04-26 Weld up 3 steam tube section 809
2013-05-02 Fit and install window in 864
2013-05-02 Warranty Printer Repair
2013-05-10 Install trash chute for 832 CV
2013-05-10 Install new drip pans under 808 steam tube
2013-05-10 Install fence at CLX gas tanks
2013-08-02 Install new hoist cable, west hoist, 803
2013-08-02 Filtertech Start up
2013-08-02 Start and check 832 AC
2013-08-02 Taymer making modifications to printers
2013-08-07 Fabricate and install guards for 832
2013-08-07 Inspect Printer Change Warranty Issue
2013-08-22 Repair roof drain sections at floor level
2013-08-27 Perform repairs and calibrate CV Lab Microscope
2013-09-03 Align motor and pump shafts on 832 West Pump
2013-09-03 Replace damaged hoist rail on 861 Bull Head
2013-09-04 Rework of water level piping on 832
2013-09-10 Install vent hood 826 - Repair heat vent 817--5-6
2013-09-17 Install piping for new air compressor
2013-09-17 Tap into gas line for Flamer 832
2013-09-25 Mechanical installation for 2 fan in CV dept
2013-09-25 Pressure wash storm water drains to remove copper
2013-09-25 Pull CLX for 808 upgrade
2013-09-25 Supply and install glass for window in door at RR Test Office
2013-09-26 Mechanical installation for 2 fan in CV dept
2013-09-26 Remove Load Center 2 East Transformer for repair
2013-10-17 Emergency warranty repair of oil leak new air compressor
2013-10-17 Repair of sprinkler system and piping
2013-10-17 Warranty Repair of Oil Leak on New Compressor
2013-10-22 Welder for cracks in 863
2013-10-29 Check balance on East Side 863
2013-11-01 808 Upgrade of Extruder Laser and Comms
2013-11-07 808 Upgrade of Extruder Laser and Comms
2013-11-20 Emerg Repairs to Boiler Blowdown Lines
2013-11-26 Inspect PM and Repair of Martin Tape Machine
2013-11-26 Repair Crack Refractory Number 1 Boiler
2013-12-05 Sweep Outside lots
2013-12-17 Install guard on 832 CV
2013-12-17 Install vent hood for 832 Flamer
2013-12-17 Repair of roof top heater coils
2013-12-20 Fabricate Section of Steam Tube for 807
2013-01-05 Install new doors on Pump House
2013-01-22 Standing List of SubContractors not requiring notice
2013-02-06 Replace 808 PERC with SS Welded Pipe
2013-02-21 Install window in Closet by L Reams office
2013-03-04 Cumberland Machine - Install new 832 equipment
2013-03-13 Weld up new secton of steam tube for 830
2013-03-18 Gem Gravier to commission 2 Gem Printers
2013-03-18 Installation of piping on the new 832 line
2013-03-19 Install new CV Office Door
2013-03-28 Install new telephone wiring cabinet on top of CV office
2013-04-22 Remove floor coating at 865 - test area first
2012-11-29 Pressure wash N and W walls
2013-04-26 Power Sweep outside Lots
2013-04-26 Weld up 3 steam tube section 809
2013-05-02 Fit and install window in 864
2013-05-02 Warranty Printer Repair
2013-05-10 Install trash chute for 832 CV
2013-05-10 Install new drip pans under 808 steam tube
2013-05-10 Install fence at CLX gas tanks
2013-08-02 Install new hoist cable, west hoist, 803
2013-08-02 Filtertech Start up
2013-08-02 Start and check 832 AC
2013-08-02 Taymer making modifications to printers
2013-08-07 Fabricate and install guards for 832
2013-08-07 Inspect Printer Change Warranty Issue
2013-08-22 Repair roof drain sections at floor level
2013-08-27 Perform repairs and calibrate CV Lab Microscope
2013-09-03 Align motor and pump shafts on 832 West Pump
2013-09-03 Replace damaged hoist rail on 861 Bull Head
2013-09-04 Rework of water level piping on 832
2013-09-10 Install vent hood 826 - Repair heat vent 817--5-6
2013-09-17 Install piping for new air compressor
2013-09-17 Tap into gas line for Flamer 832
2013-09-25 Mechanical installation for 2 fan in CV dept
2013-09-25 Pressure wash storm water drains to remove copper
2013-09-25 Pull CLX for 808 upgrade
2013-09-25 Supply and install glass for window in door at RR Test Office
2013-09-26 Mechanical installation for 2 fan in CV dept
2013-09-26 Remove Load Center 2 East Transformer for repair
2013-10-17 Emergency warranty repair of oil leak new air compressor
2013-10-17 Repair of sprinkler system and piping
2013-10-17 Warranty Repair of Oil Leak on New Compressor
2013-10-22 Welder for cracks in 863
2013-10-29 Check balance on East Side 863
2013-11-01 808 Upgrade of Extruder Laser and Comms
2013-11-07 808 Upgrade of Extruder Laser and Comms
2013-11-20 Emerg Repairs to Boiler Blowdown Lines
2013-11-26 Inspect PM and Repair of Martin Tape Machine
2013-11-26 Repair Crack Refractory Number 1 Boiler
2013-12-05 Sweep Outside lots
2013-12-17 Install guard on 832 CV
2013-12-17 Install vent hood for 832 Flamer
2013-12-17 Repair of roof top heater coils
2013-12-20 Fabricate Section of Steam Tube for 807